Luton Sixth Form College
This project was undertaken for Vinci Construction in Luton by Atlantic Contracts Ltd in June 2010. The project was completed on program and the college was ready for opening its doors ready for the new September school term. The building is a new build concrete structure which has 3 levels and is divided into 8 blocks. The middle section of the building is shaped as a horse shoe. This new building replaces the existing 6th Form College. The associated joinery supplied and fitted by Atlantic Contracts Ltd consisted of Oak laminated doors and frames, glazed screens, ironmongery, MDF window boards and MDF skirting.
We were then responsible for fixing all of the classroom notice boards and pin boards as well as the clocks. Following on from this we then fixed all the toilet mirrors. Atlantic Contracts then supplied and fitted the main Oak reception desk, student reception desk and fitted units.
Overview
- Main contractor: Vinci Construction
- Contract value: £900,000
- Contract period: 40 Weeks